September 6, 2018
In the last few days, I scampered across the decks of the Allied 24, took measurements of all the brightwork to be replaced - which is 100% of it - and turned those measurements into a working materials list for the teak stock necessary for fabrication of new brightwork. From bow to stern, she's getting all new teak on the exterior. The list also includes a few sheets of meranti plywood, from which I will be pulling new primary bulkheads as well as general interior construction panels. Delivery is estimated to be the 19th of the month, and will coincide with an on site meeting with the owner and the rigger to go over scope of work for the rig.
Total Time Today: 0 hrs